Startup Biomass Power Plant seeks capital

Posted in the Venture Capital Forum

First Prev
of 3
Next Last
Ramesh

Ernakulam, India

#1 Feb 8, 2008
Kerala, South India, where there water, and raw material required for setting up a Biomass Plant like the one under consideration here, is the location planned for this project. The Project is lead by experienced Engineers and consultants from the field.
In Brief:-

Capacity: 6 MW / 8 MW
Plant Load Factor: 80 %
Gross Generation: 421 / 561 Lakhs KWHr (Units) per annum
Auxiliary Consumption: 10 %
Net Export: 379 / 505 Lakhs KWHr (Units) per annum
Land Requirement: 15 Acres
Water Requirement: 800 Cu.M / day,/ 1000 Cu.M / day
Bio-mass Fuels: Rice Husk, Wood Chips, Coconut Shells, Ground Nut Shells, Bagasse, Cashew Nut Shells, Chilli / Cotton Stocks, Corn Cob, Palm Kernel, etc.
Type of Boiler: Fluidized Bed Boiler / Traveling Grate Boiler
(Depending on the Fuel Configuration)
Power Export: To State Electricity Board through PPA or Merchant Banking through PGCL / TATA Power / Reliance Power etc.
Project Cost (*): 22.00 / 28.00 Crores (INR)
Fuel Cost per Unit:~ Rs. 1.75 per Unit (Export)(Considering a Fuel Cost of Rs. 1000 – 1050 per M.T OF Biomass.
Fixed Cost per Unit:
(Financing Charges & O & M Cost)~ Rs. 1.00 per Unit
Payback with Debt : Equity of 2 : 1 - 2.5 years with a sale price of Rs. 3.50 per Unit.
- 4 years with a sale price of Rs. 3.25 per Unit.
- 7 years with a sale price of Rs. 3.00 per Unit.
CDM Benefits Being a Renewable Energy Project eligible for CDM benefits, the additional income from CDM will be around Rs. 2.2 Crores per annum for 6 MW Plant and about 3.0 Crores per annum for 8 MW Plant.

Considering the CDM Revenue the payback period will come down to less than 3 years, even with a sale price of Rs. 3.00 per unit.

(*)- Project Cost are Site Specific and depends upon the type of Land / Soil, Water availability etc., and can undergo some changes.
Naipaul

Kissimmee, FL

#2 Feb 9, 2008
i would be interested only a partner.
dseegolam@gmail.com
Anil Rathi

New Delhi, India

#4 May 5, 2008
It is interesting but what is availabilty and reliability of power production in these type of plants
Nagendran A

Bangalore, India

#5 May 12, 2008
We are intrested in a 1 MW Bio mass project for our own use ,

Please send in your quote and other details

With Regards

Nagendran A

9845023961
Ramesh wrote:
Kerala, South India, where there water, and raw material required for setting up a Biomass Plant like the one under consideration here, is the location planned for this project. The Project is lead by experienced Engineers and consultants from the field.
In Brief:-
Capacity: 6 MW / 8 MW
Plant Load Factor: 80 %
Gross Generation: 421 / 561 Lakhs KWHr (Units) per annum
Auxiliary Consumption: 10 %
Net Export: 379 / 505 Lakhs KWHr (Units) per annum
Land Requirement: 15 Acres
Water Requirement: 800 Cu.M / day,/ 1000 Cu.M / day
Bio-mass Fuels: Rice Husk, Wood Chips, Coconut Shells, Ground Nut Shells, Bagasse, Cashew Nut Shells, Chilli / Cotton Stocks, Corn Cob, Palm Kernel, etc.
Type of Boiler: Fluidized Bed Boiler / Traveling Grate Boiler
(Depending on the Fuel Configuration)
Power Export: To State Electricity Board through PPA or Merchant Banking through PGCL / TATA Power / Reliance Power etc.
Project Cost (*): 22.00 / 28.00 Crores (INR)
Fuel Cost per Unit:~ Rs. 1.75 per Unit (Export)(Considering a Fuel Cost of Rs. 1000 – 1050 per M.T OF Biomass.
Fixed Cost per Unit:
(Financing Charges & O & M Cost)~ Rs. 1.00 per Unit
Payback with Debt : Equity of 2 : 1 - 2.5 years with a sale price of Rs. 3.50 per Unit.
- 4 years with a sale price of Rs. 3.25 per Unit.
- 7 years with a sale price of Rs. 3.00 per Unit.
CDM Benefits Being a Renewable Energy Project eligible for CDM benefits, the additional income from CDM will be around Rs. 2.2 Crores per annum for 6 MW Plant and about 3.0 Crores per annum for 8 MW Plant.
Considering the CDM Revenue the payback period will come down to less than 3 years, even with a sale price of Rs. 3.00 per unit.
(*)- Project Cost are Site Specific and depends upon the type of Land / Soil, Water availability etc., and can undergo some changes.
John Gilvary

San Jose, CA

#6 May 14, 2008
How much (in USD) are you looking for?
Ramesh wrote:
Kerala, South India, where there water, and raw material required for setting up a Biomass Plant like the one under consideration here, is the location planned for this project. The Project is lead by experienced Engineers and consultants from the field.
In Brief:-
Capacity: 6 MW / 8 MW
Plant Load Factor: 80 %
Gross Generation: 421 / 561 Lakhs KWHr (Units) per annum
Auxiliary Consumption: 10 %
Net Export: 379 / 505 Lakhs KWHr (Units) per annum
Land Requirement: 15 Acres
Water Requirement: 800 Cu.M / day,/ 1000 Cu.M / day
Bio-mass Fuels: Rice Husk, Wood Chips, Coconut Shells, Ground Nut Shells, Bagasse, Cashew Nut Shells, Chilli / Cotton Stocks, Corn Cob, Palm Kernel, etc.
Type of Boiler: Fluidized Bed Boiler / Traveling Grate Boiler
(Depending on the Fuel Configuration)
Power Export: To State Electricity Board through PPA or Merchant Banking through PGCL / TATA Power / Reliance Power etc.
Project Cost (*): 22.00 / 28.00 Crores (INR)
Fuel Cost per Unit:~ Rs. 1.75 per Unit (Export)(Considering a Fuel Cost of Rs. 1000 – 1050 per M.T OF Biomass.
Fixed Cost per Unit:
(Financing Charges & O & M Cost)~ Rs. 1.00 per Unit
Payback with Debt : Equity of 2 : 1 - 2.5 years with a sale price of Rs. 3.50 per Unit.
- 4 years with a sale price of Rs. 3.25 per Unit.
- 7 years with a sale price of Rs. 3.00 per Unit.
CDM Benefits Being a Renewable Energy Project eligible for CDM benefits, the additional income from CDM will be around Rs. 2.2 Crores per annum for 6 MW Plant and about 3.0 Crores per annum for 8 MW Plant.
Considering the CDM Revenue the payback period will come down to less than 3 years, even with a sale price of Rs. 3.00 per unit.
(*)- Project Cost are Site Specific and depends upon the type of Land / Soil, Water availability etc., and can undergo some changes.
Kulothungan

Chennai, India

#7 Jun 23, 2008
Where is it proposed? Interested in joint venture , can be considered as a SPV. What is the present price of purchase of power from the plant by Kerala State Electricity Board.
Venkataramana

Hubli, India

#10 Jul 19, 2008
i would be interested work with you i am a EPC contractor.
monika

Delhi, India

#11 Aug 2, 2008
We are interested in JV/Stake/Funding, pls advise the latest status
Regards
Monika
Ramesh wrote:
Kerala, South India, where there water, and raw material required for setting up a Biomass Plant like the one under consideration here, is the location planned for this project. The Project is lead by experienced Engineers and consultants from the field.
In Brief:-
Capacity: 6 MW / 8 MW
Plant Load Factor: 80 %
Gross Generation: 421 / 561 Lakhs KWHr (Units) per annum
Auxiliary Consumption: 10 %
Net Export: 379 / 505 Lakhs KWHr (Units) per annum
Land Requirement: 15 Acres
Water Requirement: 800 Cu.M / day,/ 1000 Cu.M / day
Bio-mass Fuels: Rice Husk, Wood Chips, Coconut Shells, Ground Nut Shells, Bagasse, Cashew Nut Shells, Chilli / Cotton Stocks, Corn Cob, Palm Kernel, etc.
Type of Boiler: Fluidized Bed Boiler / Traveling Grate Boiler
(Depending on the Fuel Configuration)
Power Export: To State Electricity Board through PPA or Merchant Banking through PGCL / TATA Power / Reliance Power etc.
Project Cost (*): 22.00 / 28.00 Crores (INR)
Fuel Cost per Unit:~ Rs. 1.75 per Unit (Export)(Considering a Fuel Cost of Rs. 1000 – 1050 per M.T OF Biomass.
Fixed Cost per Unit:
(Financing Charges & O & M Cost)~ Rs. 1.00 per Unit
Payback with Debt : Equity of 2 : 1 - 2.5 years with a sale price of Rs. 3.50 per Unit.
- 4 years with a sale price of Rs. 3.25 per Unit.
- 7 years with a sale price of Rs. 3.00 per Unit.
CDM Benefits Being a Renewable Energy Project eligible for CDM benefits, the additional income from CDM will be around Rs. 2.2 Crores per annum for 6 MW Plant and about 3.0 Crores per annum for 8 MW Plant.
Considering the CDM Revenue the payback period will come down to less than 3 years, even with a sale price of Rs. 3.00 per unit.
(*)- Project Cost are Site Specific and depends upon the type of Land / Soil, Water availability etc., and can undergo some changes.
Vijay Kumbham

Hyderabad, India

#13 Oct 6, 2008
We are interested in setting up a similar project for our own use. Please contact with details.
Vijay Narayan

Bangalore, India

#14 Nov 8, 2008
We are a Consultants based at bangalore, our Clients are interested in taking over the Power plant, mentioned below, please let us know whether you are interested in selling the same.

Kindly revert back to us at the earliest, so that we can take this further.
Thanks

Vijay Narayan
Director
On Demand Solutions I Pvt. Ltd.
Bangalore
M:09448003984
Ramesh wrote:
Kerala, South India, where there water, and raw material required for setting up a Biomass Plant like the one under consideration here, is the location planned for this project. The Project is lead by experienced Engineers and consultants from the field.
In Brief:-
Capacity: 6 MW / 8 MW
Plant Load Factor: 80 %
Gross Generation: 421 / 561 Lakhs KWHr (Units) per annum
Auxiliary Consumption: 10 %
Net Export: 379 / 505 Lakhs KWHr (Units) per annum
Land Requirement: 15 Acres
Water Requirement: 800 Cu.M / day,/ 1000 Cu.M / day
Bio-mass Fuels: Rice Husk, Wood Chips, Coconut Shells, Ground Nut Shells, Bagasse, Cashew Nut Shells, Chilli / Cotton Stocks, Corn Cob, Palm Kernel, etc.
Type of Boiler: Fluidized Bed Boiler / Traveling Grate Boiler
(Depending on the Fuel Configuration)
Power Export: To State Electricity Board through PPA or Merchant Banking through PGCL / TATA Power / Reliance Power etc.
Project Cost (*): 22.00 / 28.00 Crores (INR)
Fuel Cost per Unit:~ Rs. 1.75 per Unit (Export)(Considering a Fuel Cost of Rs. 1000 – 1050 per M.T OF Biomass.
Fixed Cost per Unit:
(Financing Charges & O & M Cost)~ Rs. 1.00 per Unit
Payback with Debt : Equity of 2 : 1 - 2.5 years with a sale price of Rs. 3.50 per Unit.
- 4 years with a sale price of Rs. 3.25 per Unit.
- 7 years with a sale price of Rs. 3.00 per Unit.
CDM Benefits Being a Renewable Energy Project eligible for CDM benefits, the additional income from CDM will be around Rs. 2.2 Crores per annum for 6 MW Plant and about 3.0 Crores per annum for 8 MW Plant.
Considering the CDM Revenue the payback period will come down to less than 3 years, even with a sale price of Rs. 3.00 per unit.
(*)- Project Cost are Site Specific and depends upon the type of Land / Soil, Water availability etc., and can undergo some changes.

“Seeking Project $1M up”

Since: Nov 08

Universe

#15 Nov 9, 2008
Innovative project financing for today's global leaders
• 100% LTV Worldwide Project Financing
• Funding from $2 Million USD to $100 Million USD
• Funding in 45 to 60 banking days
• Financing approvals within 24-48 hours
• Interest Rates between 6.5%- 8.25% 30 year fix.
• Interest Only Payments
• No Pre Payment Penalty
• No minimum credit requirements
• Borrower must provide a solid business plan and exit strategy
• 10-15% Equity Contribution into the deal is required
• Transaction facilitated by experienced structured financing attorney
luisgtorres@paris.com
Ramesh wrote:
Kerala, South India, where there water, and raw material required for setting up a Biomass Plant like the one under consideration here, is the location planned for this project. The Project is lead by experienced Engineers and consultants from the field.
In Brief:-
Capacity: 6 MW / 8 MW
Plant Load Factor: 80 %
Gross Generation: 421 / 561 Lakhs KWHr (Units) per annum
Auxiliary Consumption: 10 %
Net Export: 379 / 505 Lakhs KWHr (Units) per annum
Land Requirement: 15 Acres
Water Requirement: 800 Cu.M / day,/ 1000 Cu.M / day
Bio-mass Fuels: Rice Husk, Wood Chips, Coconut Shells, Ground Nut Shells, Bagasse, Cashew Nut Shells, Chilli / Cotton Stocks, Corn Cob, Palm Kernel, etc.
Type of Boiler: Fluidized Bed Boiler / Traveling Grate Boiler
(Depending on the Fuel Configuration)
Power Export: To State Electricity Board through PPA or Merchant Banking through PGCL / TATA Power / Reliance Power etc.
Project Cost (*): 22.00 / 28.00 Crores (INR)
Fuel Cost per Unit:~ Rs. 1.75 per Unit (Export)(Considering a Fuel Cost of Rs. 1000 – 1050 per M.T OF Biomass.
Fixed Cost per Unit:
(Financing Charges & O & M Cost)~ Rs. 1.00 per Unit
Payback with Debt : Equity of 2 : 1 - 2.5 years with a sale price of Rs. 3.50 per Unit.
- 4 years with a sale price of Rs. 3.25 per Unit.
- 7 years with a sale price of Rs. 3.00 per Unit.
CDM Benefits Being a Renewable Energy Project eligible for CDM benefits, the additional income from CDM will be around Rs. 2.2 Crores per annum for 6 MW Plant and about 3.0 Crores per annum for 8 MW Plant.
Considering the CDM Revenue the payback period will come down to less than 3 years, even with a sale price of Rs. 3.00 per unit.
(*)- Project Cost are Site Specific and depends upon the type of Land / Soil, Water availability etc., and can undergo some changes.
vibha

Chennai, India

#16 Nov 10, 2008
how to arrive at the water requirements for a 33TPH boiler at 66 Kg/hr and 495 dec to produce 65 Kg/hr at 485 deg c to the inlet turbine. that is what amount of water is required to produce 6MW per hour at this pressure ratings? and Mr.ramesh how did you arrive at the water requirement per day
eswar

Pune, India

#18 Mar 8, 2009
We are intrested in a 1 MW Bio mass project for business purpose
please let me know the details about project cost and what are the permissions requried to put up new plant
suresh kumar

Mumbai, India

#21 Sep 1, 2009
details for 6mv power plant cost and other details
gaganjit sodhi

Mumbai, India

#23 Nov 5, 2009
we r interested. if finance can be provided, when earliest can u start generating & selling power. respond to gaganjit on 9769692930

Since: Nov 09

High Point, NC

#24 Nov 6, 2009
John Gilvary wrote:
How much (in USD) are you looking for?
<quoted text>
Hi John,

I am planning to venture into a biomass plant myself in India and in the process of finding partners.
Let me know if you would like to talk further. You can email me at kjohri@gmail.com
Regards,
Kaustubh

Since: Nov 09

High Point, NC

#25 Nov 6, 2009
Hi,
I am looking for partnerships as well for a biomass plant in TN area. I am a resident of Chennai too, although I am at US currently. Please email me at kjohri@gmail.com for details.
Regards,
Kaustubh
Kulothungan wrote:
Where is it proposed? Interested in joint venture , can be considered as a SPV. What is the present price of purchase of power from the plant by Kerala State Electricity Board.

Since: Nov 09

High Point, NC

#26 Nov 6, 2009
Hi Monika,
I am looking for JV/Funding for a biomass based plant in TN area. Please email me at kjohri@gmail.com for details.
Regards,
Kaustubh
monika wrote:
We are interested in JV/Stake/Funding, pls advise the latest status
Regards
Monika
<quoted text>

Since: Nov 09

High Point, NC

#27 Nov 6, 2009
Hi Gaganjit,
I am looking for financing as well for a biomass based plant in TN. Kindly email me at kjohri@gmail.com and we can discuss the details.

Regards,
Kaustubh
gaganjit sodhi wrote:
we r interested. if finance can be provided, when earliest can u start generating & selling power. respond to gaganjit on 9769692930
Thomas

Billings, MT

#28 Nov 12, 2009
US IMMIGRATION THROUGH INVESTMENT



We offer “Qualified Investment” for foreign investors seeking permanent residence in the United States. Individuals will be eligible under EB-5 immigrant visa status to obtain US green card based on a minimum financial investment of US $500,000. Prepared Term Sheets available for current investment opportunities which include FEATURE FILM PRODUCTION and a RENEWABLE ENERGY PROJECT. All inquiries held strictly confidential.
Ramesh wrote:
Kerala, South India, where there water, and raw material required for setting up a Biomass Plant like the one under consideration here, is the location planned for this project. The Project is lead by experienced Engineers and consultants from the field.
In Brief:-
Capacity: 6 MW / 8 MW
Plant Load Factor: 80 %
Gross Generation: 421 / 561 Lakhs KWHr (Units) per annum
Auxiliary Consumption: 10 %
Net Export: 379 / 505 Lakhs KWHr (Units) per annum
Land Requirement: 15 Acres
Water Requirement: 800 Cu.M / day,/ 1000 Cu.M / day
Bio-mass Fuels: Rice Husk, Wood Chips, Coconut Shells, Ground Nut Shells, Bagasse, Cashew Nut Shells, Chilli / Cotton Stocks, Corn Cob, Palm Kernel, etc.
Type of Boiler: Fluidized Bed Boiler / Traveling Grate Boiler
(Depending on the Fuel Configuration)
Power Export: To State Electricity Board through PPA or Merchant Banking through PGCL / TATA Power / Reliance Power etc.
Project Cost (*): 22.00 / 28.00 Crores (INR)
Fuel Cost per Unit:~ Rs. 1.75 per Unit (Export)(Considering a Fuel Cost of Rs. 1000 – 1050 per M.T OF Biomass.
Fixed Cost per Unit:
(Financing Charges & O & M Cost)~ Rs. 1.00 per Unit
Payback with Debt : Equity of 2 : 1 - 2.5 years with a sale price of Rs. 3.50 per Unit.
- 4 years with a sale price of Rs. 3.25 per Unit.
- 7 years with a sale price of Rs. 3.00 per Unit.
CDM Benefits Being a Renewable Energy Project eligible for CDM benefits, the additional income from CDM will be around Rs. 2.2 Crores per annum for 6 MW Plant and about 3.0 Crores per annum for 8 MW Plant.
Considering the CDM Revenue the payback period will come down to less than 3 years, even with a sale price of Rs. 3.00 per unit.
(*)- Project Cost are Site Specific and depends upon the type of Land / Soil, Water availability etc., and can undergo some changes.

Tell me when this thread is updated:

Subscribe Now Add to my Tracker
First Prev
of 3
Next Last

Add your comments below

Characters left: 4000

Please note by submitting this form you acknowledge that you have read the Terms of Service and the comment you are posting is in compliance with such terms. Be polite. Inappropriate posts may be removed by the moderator. Send us your feedback.

Venture Capital Discussions

Title Updated Last By Comments
Bain Capital's "Guitar Center" going down fast (Oct '12) Sep 21 I am the one who ... 14
Velocity Venture Capital looking for entrepreneurs (Jul '13) Sep 15 Credence 2
peter Sep 15 mark aulich 4
Looking for companies and projects that need ve... (May '06) Sep 12 Romas 435
loans for business purchase Sep 8 mark aulich 1
investment opportunity Sep 7 ray 1
johnhawkinsloanfirm@yahoo.com (Nov '13) Sep 6 M S Swaminathan 3

Venture Capital People Search

Addresses and phone numbers for FREE