SHUT DOWN MARK I REACTORS

Shelburne, VT

#22 Mar 7, 2013
"The ‘defense-in-depth’ approach for nuclear power plants is based on multiple layers of safety through redundant systems and equipment.”

-not so much with the GE Mark I reactors as we found out with Fukushima, and we still have another Mark I running in Vernon

Remember the "GE Three" ??
They quit GE in protest over that badly flawed Lemon of a design reactor and were blackballed by GE
http://en.wikipedia.org/wiki/GE_Three
And we have almost 2 dozen Mark I's still running in the US, VY in Vernon Vermont and Pilgrim in Mass are 2 of them
Three Mark I's melted down at the Fukushima Daiichi facility
SHUT THEM DOWN
http://org2.democracyinaction.org/o/5502/p/di...

///////

Insane Japan To Restart 6 Reactors In 2013
http://rt.com/news/japan-nuclear-energy-retur...

//////////
7 More Fukushima Children To Have Thyroid Surgery

On 2/13/2013, 2 more Fukushima children were diagnosed with thyroid cancer and 7 more Fukushima children are suspected to have thyroid cancer as well. These are thyroid cancer for 80% of possibility
http://fukushima-diary.com/2013/03/express-7-...

///////
Japan's "Long War" to shut down Fukushima Reuters
http://uk.reuters.com/article/2013/03/05/us-j...

///////

‘Did We Just Kill A Kid?’— The Six Words That Ended A US Drone Pilot’s Career http://www.businessinsider.com/did-we-just-ki...

/\/\/--/\/

^The satanism of the 'I Pet Goat' video explained>
http://www.youtube.com/watch...

9/11 Bush and the crowley-esque satanic ritual as 9/11 was happening! "
the 'kids'(goats) in the classroom chant "Plane - Must - Hit - Steel " just as they actually DID!!
http://www.youtube.com/watch...
http://www.google.com/#hl=en&output=searc...
Mike Mulligan

Brattleboro, VT

#23 Mar 7, 2013
You project the image of a anti nuker to look very poorly really good!
QuakeAloneCaused Fukushima

Brattleboro, VT

#24 Mar 10, 2013
[How time flies- Tomorrow is the second anniversary of the three General Electric Mark I reactors melting down at Fukushima Japan]
***
**
*
'Fukushima Workers: Smoke was pouring out of Unit 1 before tsunami hit —“No doubt” the quake crippled reactors'
http://enenews.com/fukushima-workers-smoke-po...

Several of the workers also said the plant’s No 1 reactor was critically damaged by the quake even before the tsunami hit – a revelation that, if proven, would torpedo Japan’s attempts to swiftly restart its 50 stalled nuclear reactors.
***
I've posted articles in 2011 and last year on the evidence that the 9.0 earthquakelon caused the problems leading to the meltdowns of the three GE Mark I reactors. It means that even if the subsequent tsunami hadn't occured we Still would have seen the reactors melt down

NY Times
July 5, 2012
'Report suggests extensive damage from quake at Fukushima Daiichi'— Pipes may have burst leading to loss of cooling within 30 minutes
http://www.nytimes.com/2012/07/06/world/asia/...
/////////

Nut Mike Mulligan adds crazy comments to nuketard Meredith Angwin's BS blog- http://yesvy.blogspot.com/2013/02/the-vermont...
She is with the Ethan Allen Institute which wants us to beLIEve it is 'independent' when it's totally in bed with Entergy/VY
//////
\\\\\\
'Only two papal candidates 'clean' of sex abuse scandals, says victims group'
A clergy abuse victims group has named cardinals from Austria and the Philippines as the only papal contenders untainted by sex abuse scandals.
http://www.telegraph.co.uk/news/religion/the-...
///////

The True Meaning Behind Holder’s Response to Rand Paul
http://www.infowars.com/the-true-meaning-behi...

Look what Obama did to this poor girl
http://rense.com/1.imagesH/drone_strike_victi...
Mike Mulligan

Brattleboro, VT

#25 Mar 10, 2013
So big deal they might of had a LOCA, if they had power they should have easily overcome it with the big pumps...

I'd believe nothing out of Japan with Fukushima...

Al these angles have an anti or pro nuke spin on them...
Reading Comprehesion 101

Brattleboro, VT

#26 Mar 10, 2013
idiot! read the articles, the info on the pre-tsunmai smoke at Unit 1 And the pre-tsunami cracked pipes were both WITNESSED by the Fukushima WORKERS, this doesn't come from anti-nukers
I Know More Than You

Marlborough, NH

#27 Mar 10, 2013
QuakeAloneCausedFukushima wrote:
I am a liar and a fool
More lies from the village idiot <yawn>
Mike Mulligan

Brattleboro, VT

#28 Mar 10, 2013
Most of the outside of the control room worker was uneducated contract workers.

Sorry, you don't know how a nuke plant works...you can't interpret what they are saying though expensive education....
Mike Mulligan

Brattleboro, VT

#29 Mar 10, 2013
They had turbine pumps...HPCI and RICI... for more than 12 to 24 hours cooling the plant. This indicated the shaking wasn't bad enough to destroy all cooling pipes, pumps or damage the plant's electricity system. even the flood didn't damage the equipment yet. There wasn't a lot of damage inside the plant, maybe a recirc loop sheared or something.
Mike Mulligan

Brattleboro, VT

#31 Mar 11, 2013
If you had power the fuel survived intact.

The NRC:

The operators were faced with a catastrophic, unprecedented emergency situation. They had to work in nearly total darkness with very limited instrumentation and control systems. The operators were able to successfully cross-tie the single operating Unit 6 air-cooled diesel generator to provide sufficient ac electrical power for Units 5 and 6 to place and maintain those units in a safe shutdown condition, eventually achieving and maintaining cold shutdown.
Despite the actions of the operators following the earthquake and tsunami, cooling was lost to the fuel in the Unit 1 reactor after several hours, the Unit 2 reactor after about 71 hours, and the Unit 3 reactor after about 36 hours, resulting in damage to the nuclear fuel shortly after the loss of cooling. Without ac power, the plants were likely relying on batteries and turbine-driven and diesel-driven pumps. The operators were likely implementing their severe accident management program to maintain core cooling functions well beyond the normal capacity of the station batteries. Without the response of offsite assistance, which appears to have been hampered by the devastation in the area, among other factors, each unit eventually lost the capability to further extend cooling of the reactor cores.
Mike Mulligan

Brattleboro, VT

#32 Mar 11, 2013
still 94%
Mike Mulligan

Brattleboro, VT

#33 Mar 13, 2013
PILGRIM STATION: Nuclear plant offline for refueling, maintenance.


Events Calendar


By Frank Mand

Wicked Local Plymouth

Posted Mar 12, 2013 @ 08:00 PM

Read more: PILGRIM STATION: Nuclear plant offline for refueling, maintenance - Plymouth, MA - Wicked Local Plymouth http://www.wickedlocal.com/plymouth/news/x155...
Under Creative Commons License: Attribution Non-Commercial Share Alike
Follow us:@WickedLocal on Twitter | 119311408344 on Facebook
Mike Mulligan

Brattleboro, VT

#35 Apr 3, 2013
So from March 29 to March 30...they reduced power from 94% power to 84% power for safety reasons..this dog just severely picked up the level of leaking...
Site Update

Brattleboro, VT

#36 Apr 4, 2013
thaks mikey for these updates ewe make that tell us nothing
////
Ten Myths About Thorium As A Nuclear Energy Solution
http://www.beyondnuclear.org/storage/document...
--
Hanford Nuke Site At Risk of Explosion
http://rt.com/usa/hanford-nuclear-waste-tanks...

The Department of Energy was warned in a letter last September that there were not adequate safeguards in place to prevent build ups of flammable gasses inside nuclear waste storage tanks at the Hanford Nuclear Reservation.
http://www.king5.com/news/local/Concerns-over...

AP Says They’re Not Illegal Immigrants, They’re Immigrants Who Are Here Illegally http://www.infowars.com/associated-press-says...

They're messin with Bird Flu and might kill us all!
http://www.infowars.com/scientists-urge-obama...

Tell me when this thread is updated:

Subscribe Now Add to my Tracker
First Prev
of 2
Next Last

Add your comments below

Characters left: 4000

Please note by submitting this form you acknowledge that you have read the Terms of Service and the comment you are posting is in compliance with such terms. Be polite. Inappropriate posts may be removed by the moderator. Send us your feedback.

Brattleboro Discussions

Title Updated Last By Comments
Vermonts new economy 1 hr Community Disorga... 36
Tectonic Shift (Dec '12) 2 hr reason 400
Truth reason knowledge (Dec '12) 3 hr reason 498
A Christian Plot for Domination (Aug '11) 16 hr VaccineRights dot... 1,208
When ‘Religious Liberty’ Was Used To Deny All H... (Mar '14) 17 hr Health Care NOT a... 100
marble ace arvidson Sat ENEnews dot Com 19
Entergy Owes Overtime to Security Sift Supervis... Sep 27 Larry F-ing Smith 8

Brattleboro News Video

Brattleboro Jobs

Brattleboro People Search

Addresses and phone numbers for FREE

Brattleboro News, Events & Info

Click for news, events and info in Brattleboro

Personal Finance

Mortgages [ See current mortgage rates ]